ELH was contracted to undertake the demolition, asbestos removal and excavation of a residential property in North Bondi. The access areas were very confined and being located in a heavily populated area, parking access for our trucks were scarce.

  1. Firstly, all hazardous material including asbestos was removed and transported in smaller trucks.
  2. Our labour team from East Labour Hire was used to carry out the manual handwork including internal strip-out and the disposal of demolition waste to be recycled.
  3. Our 5.5t excavator and tipper trucks were used to demolish all hard solid waste for recycling.
  4. Excavation and preparation for the concrete footings and slab to be constructed.